Commons Workshop
$WORKSHOPBuildingSilverCommunityShared tools and workspace, scored by how many people they serve.
Milestones and tranche release
Capital releases one tranche at a time, and only when backers approve the deliverable it was raised against. Unreleased capital cannot be withdrawn by anyone.
- 1. Site secured25% · 16.0 SOLReleased
Lease signed, utilisation commitments registered on-chain.
Due 11 Jul 20263 pieces of evidenceSpend reportpublished 21d ago16.0 SOL of 16.0 SOL releasedDeclared allocation against actual spend Line Declared Actual Variance Tools and equipment 7.4 SOL 7.6 SOL +4% Space 4.5 SOL 4.2 SOL -7% Instructors 4.2 SOL 4.2 SOL +1% - Delivery reportAnchoredIPFS
bafy9qvuuqfbbwbkvjqc1s2xksu4jvssml4wd2ue5nk9bipxvmsa5dvbrq3anchored 21d ago2.7 MB - Partner organisation sign-offAttestedSHA-256
8adb06c22799e1514b5bc2f8c16d7e7ccbb9e13b8247081d7bd259911fad6e4aanchored 20d agoPartner organisation, 24d ago - Site photography and videoAnchoredArweave
6iJwouolTN5UyZOFtQnwSpVrpQ6J0EuAovGUxrFTgAKanchored 22d ago82.6 MB
- 2. Tools installed25% · 16.0 SOLUnder review
Full inventory registered with per-tool utilisation tracking.
Due 30 Aug 20263 pieces of evidenceSpend reportpublished 0s ago16.0 SOL of 16.0 SOL releasedDeclared allocation against actual spend Line Declared Actual Variance Tools and equipment 7.4 SOL 6.2 SOL -16% Space Under: scope deferred to the next tranche.
4.5 SOL 3.4 SOL -23% Instructors Came in above estimate — hardware pricing moved.
4.2 SOL 6.3 SOL +53% Overrun covered by underspend elsewhere in the tranche. No additional draw requested.
- Delivery reportAnchoredIPFS
bafyegt7niejkxhfncfnjv2kqnr1zet3yi4dh3whk2tjvw7bauzvjavt54hanchored 0s ago1.3 MB - Independent auditor findingAttestedSHA-256
9c5a170bcb02d98ce5346d19751962a7f87e849c0c833ea8a9d1197da5081949anchored 0s agoPartner organisation, 0s ago - Site photography and videoAnchoredArweave
Q07gBBypF6NBZlcfxa_ECPV7xt0pr6Pa2cz1ucDNMSJanchored 0s ago317.7 MB
Quorum1.4K / 1.6K weightApprove 84%Reject 16%Back this project to vote on whether the tranche releases.
- 3. Trades programme25% · 16.0 SOLLocked
Weekly training running with attested attendance.
Due 14 Dec 2026 - 4. Second site25% · 16.0 SOLLocked
Model replicated by a second community with no core-team involvement.
Due 21 Oct 2026
A community workshop used by forty members scores higher than a private tool used by one, even at identical nominal value. This funds physical workshops where resource contribution is measured by utilisation and reach: tools, space, and the trades training that makes them useful.
Declared at launch and checked against delivery reports when each tranche is reviewed.
- Tools and equipment
- 46%
- Space
- 28%
- Instructors
- 26%
Workstream
Repositories, with the commit anchored on-chain at the last milestone submission. After anchoring, history cannot be rewritten without the hash no longer matching.
- workshop-coreGitHubAnchored46 commits / 30d1last commit 7d agoanchored
9452c1f528a50e2a884bbcd274d705816c19779b49d agohttps://github.com/koink/workshop-core
Commit volume is shown as context and is deliberately not a factor in the accountability grade — it is trivially padded, and a platform that rewards it gets what it measures.
Named contributors with governance weight earned through the 505 Systems scoring engine — multiplicative across consistency, structural impact, and how much a contribution expanded access for others. All three must be nonzero, so the score cannot be maxed on one axis.
Contributor | Role |
|---|
Verified by an attestor, not self-reported.
Field report
quiet · 39d ago · 22 Jun 2026Milestone submitted for review. Evidence attached: repository, delivery report, and eleven peer attestations from contributors outside the core team.
Tranche released
riverkeeper · 42d ago · 19 Jun 2026Tranche released and spent against the published breakdown. Receipts are in the delivery report; the variance line is the hardware cost, which came in above estimate.
New contributors attested
quiet · 45d ago · 16 Jun 2026Slower than planned. The field trial slipped three weeks because the partner site lost connectivity for longer than the test assumed — which is, uncomfortably, the exact condition we are building for.
Address |
|---|
Showing the largest 50 of 346. Conviction is governance weight over milestone approval — it pays nothing.
Randomness receipt
Fill order was derived from this value after the window sealed. Recompute it yourself — every input is below.
- VRF output
- 0xc6b7890cec15443110a32e2cf927fda27c082469d981bee6038daad23d557a47
- Ordering root
- 0x3a7e35f77abb9233221d25b26a1c4b0cdeaea06f5f20b6478874190d1c0671e6
- Request
- CrrfWVaxw4XMUatB3dgBAtowAEFY9bxZb574kh8jnquwZ8aqxJR2qDey8tpQHJFGuJ9ynL6p48opyNX1kZAcEUpq
- Fulfilment
- 1N1shQU2BhPozoyqLcjWnmWg97WrqWVZJFXYxYaPT9sxmr8FQZC3wMcykDcoc5QgdYDjHoXNKfXuCwY3XMj61dvc
- Slots
- 298,942,614 → 298,914,246
Balance 42.00 SOL
Backing is not an investment. This token is governance over whether this project's next tranche releases — it is never a claim on its revenue or profit. Projects fail, and approving a milestone does not guarantee delivery. What this token is never
Accountability
Graded from on-chain state, not self-reported. Every factor is recomputable.
- Holder distribution20% weight
- 90
- Deployer behaviour15% weight
- 100
- Milestone delivery20% weight
- 66
- Capital at risk15% weight
- 86
- Verifiability of claims20% weight
- 74
- Team legibility10% weight
- 90
Top 10 hold 48.4% of circulating supply across 346 addresses.
Deployer holds 4.00%, at the program-enforced 5.5% cap, with no disposals.
25% of tranches released, none overdue.
75% of the raise is still locked behind unapproved milestones and cannot be withdrawn.
0 verified, 2 attested and 4 anchored across 2 submissions, with 2 spend reports published.
4 named contributors, median 80 weeks active, each with an earned DPC score.
A grade is not an endorsement. It measures structure and track record, and neither predicts whether the work succeeds. Projects fail honestly all the time.
Live activity
Quiet right now. Long-horizon projects trade far less than memecoins — a still tape on a funded project is a healthy signal, not a dead one.